Existing portfolios
Different buildings, data and responsibilities are brought into one processing model.
Housing industry · Fibre infrastructure
TM-Connect supports housing companies, property managers and owners in preparing, coordinating and progressing Telekom fibre projects.
01 · Relevance
Fibre can support reliable connectivity, digital building use, location appeal and residents’ expectations. Whether and how a property can be connected always requires a project-specific assessment.
02 · Project path
We keep information, responsibilities and next steps connected throughout the organisational project journey.
03 · Audiences
Different buildings, data and responsibilities are brought into one processing model.
Property, schedule and responsibility data is prepared early for coordination with the Telekom process.
Decision and representation questions are made visible; individual legal questions require specialist review.
Portfolio and status lists provide a reliable basis for prioritisation and follow-up.
05 · Trust
TM-Connect is an independent company and is not Deutsche Telekom. Roll-out, availability, technical design, costs and timelines are assessed by the responsible parties for each project.
06 · Detailed guidance
Structure responsibilities, information and agreement status across the portfolio.
Prepare building connections, information and responsibilities early.
Prioritise and track large portfolios property by property.
Guidance organised by role, property type and project stage.
07 · FAQ
Connecting or carrying out work on land or a building may require consent from the authorised owner side. The specific property and current Telekom documents are authoritative.
It records the necessary approval and the framework for accessing or using the property and building. The specific Telekom documents are authoritative.
Properties, responsibilities, potential, missing information and status are consolidated in structured lists and followed up step by step.
New-build connections and routes can be planned early. Existing buildings require consideration of current construction, access and ownership.
They may coordinate information, owner contacts, decisions, access and communications. Their authority must be assessed for each property.
Decisions, representation and individual ownership can affect the process. TM-Connect coordinates organisationally but does not replace legal review.
Missing information is identified, assigned and requested in a structured way.
Planning, a possible survey, connection, in-building installation and tracking usually follow. The exact sequence is project-specific.
No blanket statement is possible. Costs and conditions depend on the project, property and current Telekom documents and require individual review.
Available providers and products must be checked for the specific address using current availability tools.
A general timeline would be misleading. Scope, roll-out planning, access, consent and technical conditions all affect timing.
TM-Connect structures portfolios and contacts, supports consent and coordination processes, follows up missing information and maintains transparent status tracking.
07 · Next step